Page Title: H.B.2065: Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a community renewable energy project or microgrid.
Bill ID: H.B.2065
Bill Title: Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a community renewable energy project or microgrid.
Bill Description: Microgrid
State:
Sponsors List
Status Text
Source Link https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB2065
Bill Type
Issue Categories